| S.No |
Name of Projects |
Nature of Work |
Name of Client |
Location |
Project Cost in Cr. |
| 1 |
1×660 MW, Unit no. 5, WBPDCL Sagardighi TPP Extension Project |
Civil Structural & Architectural works for Main Plant & BOP package and Coal Handling Plant & Ash Handling Plant (CHP & AHP) Package, 275m height Chimney including Fabrication & Erection of steel structures. |
BHEL PSER |
Sagardighi, West Bengal |
365.45 Cr. |
| 2 |
Soda Ash water plant Karunga Dev Bhoomi Dwarka, Gujarat |
Civil work, Structural & Architectural work1) Civil Work Like :- Major Work including Exacvation & backfilling in Embakment/Area Grading in Rock/Soil For Reservior, Strom water Canal, Effluent Discharge Canel, See Water Intake Pump House, RCC Frame Structure 27 mtr Below Ground, Pump House, Workshop & Warehouse, Sub-station Building, Pipe Racks, boundary Wall. Circular Tank Etc. Along With Heavy Structural Steel Fabrication & Ereaction Work. |
RSPL |
Dwarka, Gujarat |
142.25 Cr. |
| 3 |
1×660 MW Panki TPP, Panki U.P. |
All civil Architectural and structural works for RCC , RWR package ,Ash handling palnt package(AHP),Raising of Ash Dyke,Coal Handling plant CHP Package |
BHEL |
Panki, Uttar Pradesh |
187.68 Cr. |
| 4 |
5X800 MW Yadadri Thermal Power Project |
Civil work of foundations in Main plant area for Units 2&4 and Civil and Architectural works of Superstructure of Power house, Bunker and other areas of Main plant of Units 2,4&5, |
BHEL |
Yadadri, Telangana |
165.53 Cr. |
| 5 |
Tanda Thermal Power Project, Stage-II, (2x660MW) |
Construction of Ash Dyke Package |
NTPC |
Tanda, Uttar Pradesh |
127.84 Cr. |
| 6 |
2X660 MW Thermal Power Station Udangudi STPP, Tuticorin, District, Tamilnadu |
Balance Civil and Architectural works of the Coal Handling Plant area for Unit 1 and 2 (Package 1) including other miscellaneous works . |
BHEL PSSR |
Udangudi, Tamilnadu |
111.14 Cr. |
| 7 |
4x270MW Thermal Power Station Manuguru, Telangana |
All Civil & Architectural Work of Raw Water Reservoir & pump House, Levelling Grading, Road Work, WBM, Earth Work etc |
BHEL |
Manuguru, Telangana |
97.27 Cr. |
| 8 |
2×800 MW NTPC Ramagundam STPP, Telangana |
Civil, Architectural works for coal handling plant & ash handling plant including Belt Conveyor, Transfer Point, MCC building. Fly Ash Silo, Road & Drain. Boiler Foundation, Bunker & Mill Bay including foundation, Feeder, Tripper & Roof slab, ID, PA & FD fans foundation lift foundation/RCC works at any level& its deck. ESP & Duct support foundations, ESP Control building, SA fan foundations, Paving in boiler, ESP of SG1 & SG2 |
BHEL – PSER |
Ramagundam, Telangana |
81.41 Cr. |
| 9 |
(2X210) + (2X210) +(1X210) MW NTPC Unchahar |
Main Civil & Chimney Construction (225 Meter) for Feroze Gandhi Unchahar Thermal Power Stage-I, II, III (5x210MW) WFGD Project Unchahar Raebareli – 229406. |
GE Power |
Unchahar, Uttar Pradesh |
70.60 Cr. |
| 10 |
4X500 MW Shimhadri Thermal Power plant |
Main Civil Work For PT Plant Pkg. WFGD Including Civil Work Like:- Gypsum Storage Shed, Control Building, MCC Building, Absorber Tank, Pipe rack, Road & Drain,Duct Support,Cable rack Etc |
GE Power India Ltd. |
Shimhadri, Andhra Pradesh |
68.59 Cr. |
| 11 |
NTPC KUDGI |
Construction of HCSD lagoon, toe drain,Inspection road and other works in Ash Dyke area at NTPC Kudgi |
NTPC LTD |
Kudgi, Karnataka |
50.17 Cr. |
| 12 |
Tata 220 KV GIS |
Civil work and building utilities for construction of 220 KV GIS Building at Anoop Hill Mumbai |
TATA |
Mumbai |
46.85 Cr. |
| 13 |
4GW IntegratedSolar PV Cells andModule Manufacturing Plant |
Land development Works at sipcot Gangaikondan, Tirunelveli, Taminladu for 4GW Integrated Solar PV Cells and Module Manufacturing Plant. |
TATA POWER SOLAR |
Tamil Nadu |
23.95 Cr. |
| 14 |
2X250MW NSPCL Bhilai FGD Project, Bhilai, Dist – Durg, Chhattisgarh |
Construction of 1 no of 150M height for RCC Single Flue Chimney complete in all respect including RCC Works, Fabrication & Erection of Steel Flue Cans, Installation of Borosilicate Glass Block Lining on inner surface of Steel Flue Can, Supply, Fabrication and Erection of Mini Shell of Titanium , Erection of Shop Fabricated Structural Platforms, Supply & Installation of Electrical Items in all respect. |
BHEL |
Bhilai, Chhattisgarh |
13.34 Cr. |
| 15 |
Rail Infrastructure, Nirsa, Dhanbad, Jharkhand. |
Civil work, Structural & Architectural work1) Civil Work Like :- Major And Minor Bridges, U Trough Railways Siding Embankment Work, Blanketing, Retaining Wall, Station Building Road & Drain Etc. |
Maithon Power Ltd. |
Maithon, Jharkhand |
126.27 Cr. |
| 16 |
Raising the Height of Tailing Dam |
Raising the height of Tailing Dam 504 m to 508 |
Hindustan Zinc Ltd. |
SK Mines Taling dam, Rajasthan |
39.71 Cr. |
| 17 |
Raising of Tailing Dam at Dariba Rajpura |
Raising of tailing Dam Phase 1 & 2 |
Hindustan Zinc Ltd. |
Rajpura, Udaipur |
33.87 Cr. |
| 18 |
DMRC Project CC- 24 |
Civil work, Structural work Include Excavation, Disposal and Structure Steel Fabrication And Ereaction Etc. |
J Kumar |
New Delhi, Delhi |
33.56 Cr. |
| 19 |
2×660 MW Thermal Power Station |
Construction of Ash Dyke |
MBECL |
Annupur, Madhya Pradesh |
37.65 Cr. |
| 20 |
2×700 MW Thermal power Plant |
Civil Work of RWR include RAW Water reservior , Pump House, Canal Intake, Disiltting Chamber, Rain water harvesting |
L&T Power |
Rajpura, Punjab |
43.94 Cr. |
| 21 |
25 MW Solar Power Plant Khimat |
Civil Works for Construction of Foundations, Building, Road & Drain, Boundary Wall Etc. |
Moser Baer |
Palanpur, Gujarat |
33.54 Cr. |
| 22 |
4000 MW Ultra Mega Power Project |
Construction of Ash Pond |
CGPL (Tata Power Co Ltd) |
Mundra, Gujarat |
31.50 Cr. |
| 23 |
Construction of Apollo Tyre Factory Phase-II |
Road Works, Drain & Foundation Works |
Apollo Tyres Ltd |
Orgadam, Chennai |
55.42 Cr. |
| 24 |
2500MW HVDC Substation |
Civil work of 2500MW HVDC Substation at Bhiwadi Rajasthan |
SIEMENS |
Bhiwadi Rajasthan |
18.57 Cr. |
| 25 |
2×660 MW NTPC Talcher TPS |
Civil Works of TG Foundation ( TG Raft, Column and TG Deck) of Power House for unit-1 and Unit-2 and other miscellaneous foundations/Structures ect within power house area at 2×660 MW NTPC Talcher TPS |
BHEL PSER |
Talcher Odissa |
12.12 Cr. |